Click Here to
Take the LCAP Survey
Local Control Accountability Plan

School Facilities Assessment
& Project Planning

Facilities Advisory Subcommittee Community
Facilities Survey
Town Hall Information & Presentations
Measure S Presentations Facilities Reports Informational Flyers

Measure S Informational Flyers

Resolution Ordering a School Bond Election - Measure S

Click Here for PDF Informational Flyer Download

mailer

Presentations

Presented at the Board of Education Meeting Listed

Reports

Presentations from the 10/2/2014 Board of Education Meeting

Fred Kelly Stadium Master Plan

CP Appraisers of Orange Report on School Bond Elections and Home Values

Comprehensive Facilities Master Plan Now Available Online

Additional Reports Added Online!

Overview of the OUSD District-wide Planning Guidelines (2013)

High School Planning Goals (Draft) – October 2013

Comprehensive High Schools Condition Assessment

June 2013 Facilities Condition Assessment by Parsons highlights significant deficiencies in OUSD high school facilities:

  • Using a Facilities Condition Index (FCI) measurement, all four high schools were rated Poor.
  • One campus has reached, and all four are approaching threshold at which major renovation of demolition must be considered.
  • Current total needs is estimated to be at least $199.7 million.  If not addressed that estimate rises to $267.0 million in ten years.

Summary of Master Planning Process Overview

OUSD is actively developing site plans for future development of its four comprehensive high schools along with Fred Kelly Stadium.

Plans for each high school will be developed in a way that blends general school needs with the local character and needs of each site.

  • Community meetings are taking place to solicit local feedback.
  • Each school has a core group of community members, parents, faculty, and staff working with school design architects to build plans.
  • Additional community feedback may be provided through www.orangeusd.org.